Plastic quality criteria
IPC 610-A card quality criteria
Metal parts
Personnel qualified in critical aspects in production lines and certified in IPC610, ESD, QRQC and knowledge in stoppages and line starts.
Visual inspectors level GP12.
Pre-shipment Inspection (IPE).
Initial production review (RIP).
Production monitoring (MDP).
Review during production at 100% (RDP).
Change of integrated Circuits (IC, BGAs) routing between components, touch-up of gold fingers.
Personnel for warehouse and material handling
Cosmetic sortings defects (tone and color inspection).
Critical repairs of PCBA´s (SMT, PTH), trak array, pad´s, thruhole.
Packing of material
